Over the past week we have began the cooldown process of SCUBA-2, which includes a lengthy preflush of the refrigeration system. We expect to get to base temperature some time this week.

The bottom graph in those shown above shows the temperature of the mixing chamber, on its way from over 300K down to 4K.